KCN Viglacera Trấn Yên

T: +84 888 252 288
  • Tiếng Việt
  • English
  • 한국어
  • 简体中文
  • 日本語
  • ABOUT US
    • About Viglacera Corporation
    • Real Estates
    • International Cooperation
    • Achievement and Awards
  • LAO CAI PROVINCE
  • Tran Yen – Phase 1
  • ADVANTAGES OF INDUSTRIAL PARK
  • INVESTMENT GUIDE
  • News
  • CONTACT

Hanoi breaks ground on Ring Road No.4

by cadmin / Sunday, 25 June 2023 / Published in News

Prime Minister Pham Minh Chinh attended the ground-breaking ceremony of Ring Road 4 which spans 112km through Ha Noi, Hung Yen and Bac Ninh.


Prime Minister Pham Minh Chinh issued the order to start the project.

Addressing the event, Prime Minister Pham said infrastructure development is one of the three strategic breakthroughs defined by the Party.

“The investment in the construction of Ring Road 4, located in the Capital Region, will create new opportunities for development in the entire region, particularly benefiting Hanoi and the provinces of Hung Yen and Bac Ninh, through which the route passes,” Prime Minister Pham Minh Chinh said.

Prime Minister Pham Minh Chinh also emphasized that the groundbreaking ceremony marked the first step towards success and highlighted the magnitude of the upcoming tasks that lie ahead.

The Ring Road 4 project has a total length of 112.8 km and is initially estimated to require a total investment of VND85,813 billion. Substantial progress is expected to be made by 2026 and the project is expected to become operational in 2027.

The project is divided into seven different component projects, which will be implemented independently. In addition, the National Assembly has granted specific mechanisms to facilitate investment capital, implementation, hiring contractors on a non-competitive basis, and managing the utilization of materials for the project.


The project has total investment capital of VND 85 trillion. Photo: dantri.com.vn

In Hanoi, work on the Ring Road 4 – Capital Region project has started at four designated sites:

Starting Point No. 1 is located at the primary bridge intersection of Ring Road 4 and Thang Long Boulevard (at Km28+900 of Ring Road 4, corresponding to Km12+600 of Thang Long Boulevard) in Song Phuong Commune, Hoai Duc District.

Starting point No. 2 is located at the intersection of Ring Road 4 and National Highway 2 (at Km1+445) in Thanh Xuan commune, Soc Son district.

Starting point No. 3 is located at the intersection of the South Axis (at Km45+700) within the territory of Tam Hung Commune, Thanh Oai District.

Starting point No. 4 is at the intersection of Ring Road 4 and the old National Highway 1A (at Km52+600 of Ring Road 4, corresponding to Km190+270 of National Highway 1A) in Van Binh commune, Thuong Tin district.

Source: https://hanoitimes.vn

  • Tweet

About cadmin

What you can read next

LS Electric Vietnam factory was inaugurated in Yen Phong Industrial Park (Expansion Phase) (Viglacera), Bac Ninh
Viglacera – Top 10 leading brands in Vietnam in 2025
Get ready to deal with 2023 economic headwinds

Recent Posts

  • Viglacera’s Industrial Parks Accelerate Investment Promotion in October 2025

    In October 2025, Viglacera Real Estate Company ...
  • Viglacera Newsletter Q3 2025

    Viglacera Newsletter Q3 2025...
  • Các khu công nghiệp của Viglacera tăng tốc xúc tiến đầu tư trong tháng 10/2025

    Trong tháng 10/2025, Công ty Kinh doanh Bất độn...
  • Bản tin Quý 3 năm 2025

    Khu công nghiệp Viglacera - Bản tin Quý 3 năm 2...
  • Viglacera工业区吸引了国际投资者前来考察并寻找扩大生产的机会

    2025年9月,越南与美国达成有利的互惠关税协议,国际投资者对越南市场的关注度显示着提升。众多...
VIGLACERA REAL ESTATE COMPANY
Office: 2nd Floor, Viglacera Tower, No. 1 Thang Long Boulevard, Dai Mo Ward, Hanoi
E-mail: vir@viglaceraland.vn | Fax: (+84-24) 3553 7666 | Tel: (+84-24) 3553 6688
Website: www.viglaceraip.com
HOTLINE
+84 888252288 | +84 987708387
+84 903405099 | +84 888692288

Copyright 2024 © Viglacera. Designed by INNOCOM.

TOP