KCN Viglacera Trấn Yên

T: +84 888 252 288
  • Tiếng Việt
  • English
  • 한국어
  • 简体中文
  • 日本語
  • INVESTOR
    • About Viglacera Corporation
    • Real Estates
    • International Cooperation
    • Achievement and Awards
  • LAO CAI PROVINCE
  • Tran Yen – Phase 1
  • Investment Guide
  • News
  • CONTACT US

Finalizing the groundbreaking date for the Hanoi Capital region Ring Road No. 4

by cadmin / Friday, 01 August 2025 / Published in News

Component project 3, construction of the Ring Road 4 Expressway in the Hanoi Capital Region is expected to start on August 19 this year.


Intersection of Ring Road 4 Expressway with National Highway 6 (Hanoi). Photo: Hanoi People’s Committee

The Ring Road 4 in the Hanoi Capital Region is implemented according to 7 component projects, of which component project 3 is the “backbone” including the nearly 113km long expressway (the section through Hanoi is 57km long, Hung Yen is 19km long, Bac Ninh is 27km long and the connecting route towards the Noi Bai – Ha Long Expressway is about 9.7km long).

In which, the low-lying section is about 32km long, the elevated section is more than 80km long. The road has 6 lanes, a parallel road system on both sides, a green corridor, technical infrastructure works and land reserved for the belt railway. The design speed of the route is 100km/h.

The project will be invested in the construction of 8 complete interchanges. Of which, 5 are in Hanoi; 2 are in Hung Yen province; 1 is in Bac Ninh province. At the same time, the project will invest in the construction of 7 branches connecting to the parallel roads on both sides. In mid-June 2025, the Hanoi People’s Committee approved the results of selecting investors to implement component project 3 – Investment in the construction of expressways under the form of public-private partnership, under the Investment Project to build Ring Road 4 in the Hanoi Capital Region.

Source: laodong.vn

  • Tweet
Tagged under: Ring Road 4 Expressway, viglacera

About cadmin

What you can read next

Enterprises continue to expand production in Phu Ha Industrial Park (Phu Tho)
LS Electric Vietnam factory was inaugurated in Yen Phong Industrial Park (Expansion Phase) (Viglacera), Bac Ninh
Ministry proposes regulations on IPs, EZs be upgraded to law from decree

Recent Posts

  • Draft created on October 9, 2024 at 2:32 am

    ...
  • Thuan Thanh Eco-Smart IP: A Rising Investment Destination In Northern Vietnam

    Viglacera is recognized as a leading industrial...
  • Viglacera’s Industrial Parks Accelerate Investment Promotion in October 2025

    In October 2025, Viglacera Real Estate Company ...
  • Viglacera Newsletter Q3 2025

    Viglacera Newsletter Q3 2025...
  • Viglacera’s Industrial Parks Accelerate Investment Promotion Activities in October 2025

    In October 2025, Viglacera Real Estate Company ...
VIGLACERA REAL ESTATE COMPANY
Office: 2nd Floor, Viglacera Tower, No. 1 Thang Long Boulevard, Dai Mo Ward, Hanoi
E-mail: vir@viglaceraland.vn | Fax: (+84-24) 3553 7666 | Tel: (+84-24) 3553 6688
Website: www.viglaceraip.com
HOTLINE
+84 888252288 | +84 987708387
+84 903405099 | +84 888692288

Copyright 2024 © Viglacera. Designed by INNOCOM.

TOP