KCN Viglacera Trấn Yên

T: +84 888 252 288
  • Tiếng Việt
  • English
  • 한국어
  • 简体中文
  • 日本語
  • ABOUT US
    • About Viglacera Corporation
    • Real Estates
    • International Cooperation
    • Achievement and Awards
  • LAO CAI PROVINCE
  • Tran Yen – Phase 1
  • ADVANTAGES OF INDUSTRIAL PARK
  • INVESTMENT GUIDE
  • News
  • CONTACT

Hanoi and Bac Ninh agree on the site clearance plan for the road connecting to Gia Binh Airport

by cadmin / Wednesday, 26 March 2025 / Published in News

Hanoi and Bac Ninh have just agreed on the land clearance plan, investment form… for the Gia Binh airport connection route; to ensure proactive implementation, as well as create conditions for reasonable resource allocation between the two localities.

The Hanoi People’s Committee has just issued Notice No. 156/TB-VP on the conclusion of Vice Chairman of the Hanoi People’s Committee Duong Duc Tuan regarding the investment plan to build a route connecting Gia Binh airport (Bac Ninh) with the center of the capital.

Accordingly, Hanoi agrees on the investment plan to build a route connecting from Gia Binh airport to the center of Hanoi (the section passing through Hanoi) according to the proposal of the Department of Planning and Architecture in Document No. 1017/QHKT-HTKT dated March 19, 2025.

The route is determined to have a total length of 35.5 km. Of which, the section through Hanoi City is 14 km long, including 7 km of new construction from the connection point with Bac Ninh province across the Duong River, and the remaining 7 km coinciding with the Hanoi – Thai Nguyen Expressway/Ring Road no. 3. The route direction will follow the Lao Cai – Hanoi – Hai Phong railway axis, through the Trung Mau station area, connecting with the intersection between the Hanoi – Lang Son Expressway and the Hanoi – Thai Nguyen Expressway, then connecting with the Tu Lien Bridge approach road, leading straight to the center of Hanoi Capital.

The project of the route connecting Gia Binh Airport with Hanoi Capital has strategic significance in terms of traffic, is the driving force for the development of the Northeast region of Hanoi, expanding the urban space of the Capital and creating a solid foundation for regional connectivity in the key economic region of the North. In addition, Gia Binh airport is identified as a national key project, playing a special role in the system of national defense and security projects. After completion, the airport will serve the training and combat readiness missions of the People’s Public Security Air Force, and at the same time act as a reserve for the flight operations of the Air Defense – Air Force. The airport is also a support option for civil airports in the region in case of emergency situations.

According to the direction of Prime Minister Pham Minh Chinh, the route connecting to Gia Binh airport needs to be built as quickly, directly, beautifully and effectively as possible, and must be completed within a maximum of 2 years.

From Thuan Thanh Eco-Smart IP, it takes only 20 minutes (13 km) to connect to Gia Binh International Airport and after the completion of Ring Road no. 4, the connection distance to Gia Binh Airport will be shortened to only 8 km (10′).

  • Tweet
Tagged under: bac ninh, Gia Binh airport, Khu công nghiệp Viglacera, viglacera industrial parks

About cadmin

What you can read next

Viglacera was honored in the Top 10 Best Industrial Real Estate Developers in 2022
Viglacera’s industrial parks are ready to welcome the wave of investment
New tax policies applicable from January 01, 2024

Recent Posts

  • Viglacera’s Industrial Parks Accelerate Investment Promotion in October 2025

    In October 2025, Viglacera Real Estate Company ...
  • Viglacera Newsletter Q3 2025

    Viglacera Newsletter Q3 2025...
  • Các khu công nghiệp của Viglacera tăng tốc xúc tiến đầu tư trong tháng 10/2025

    Trong tháng 10/2025, Công ty Kinh doanh Bất độn...
  • Bản tin Quý 3 năm 2025

    Khu công nghiệp Viglacera - Bản tin Quý 3 năm 2...
  • Viglacera工业区吸引了国际投资者前来考察并寻找扩大生产的机会

    2025年9月,越南与美国达成有利的互惠关税协议,国际投资者对越南市场的关注度显示着提升。众多...
VIGLACERA REAL ESTATE COMPANY
Office: 2nd Floor, Viglacera Tower, No. 1 Thang Long Boulevard, Dai Mo Ward, Hanoi
E-mail: vir@viglaceraland.vn | Fax: (+84-24) 3553 7666 | Tel: (+84-24) 3553 6688
Website: www.viglaceraip.com
HOTLINE
+84 888252288 | +84 987708387
+84 903405099 | +84 888692288

Copyright 2024 © Viglacera. Designed by INNOCOM.

TOP