Investor:
Scale: 255ha
Operational Time: 2024 - 2074
Industrial Park Advantages



Power is supplied from the national grid through 110/22 kV transformer station with a capacity of 2x63 MVA.

Water is supplied from a water station with a capacity of 15,000 m³/day and night.

The wastewater treatment plant has a capacity of 8,300 m³ per day and night. Solid waste from factories will be classified, collected, and treated in accordance with Lao Cai Province's regulations.

The modern information system meets standard requirements and fully supports both domestic and international communication services.

Green space accounts for 12.5% of the total area.

The rainwater drainage system is constructed separately from the wastewater drainage system.

The fire water supply system is arranged along the internal roads. The distance between fire hydrants is 120–150 meters.

The security team ensures order and safety within the industrial park.