KCN Viglacera Trấn Yên

T: +84 888 252 288
  • Tiếng Việt
  • English
  • 한국어
  • 简体中文
  • 日本語
  • INVESTOR
    • About Viglacera Corporation
    • Real Estates
    • International Cooperation
    • Achievement and Awards
  • LAO CAI PROVINCE
  • Tran Yen – Phase 1
  • Investment Guide
  • News
  • CONTACT US

North-South high-speed railway: Investing for the future

by cadmin / Tuesday, 01 April 2025 / Published in News

In a short time, the National Assembly has issued three important resolutions to implement the North-South high-speed railway project; the Lao Cai-Hanoi-Hai Phong railway line and the development of the Hanoi-Ho Chi Minh City urban railway system.

At the evening meeting on March 29 of the Steering Committee for key projects and national important projects in the railway sector, Prime Minister Pham Minh Chinh emphasized the importance of investing in railway projects and developing the railway industry.

Of which, the North-South high-speed railway project has a total length of 1,541km from Hanoi to Ho Chi Minh City, with a design speed of 350km/h. The total preliminary investment is more than 1.7 million billion VND (about 67.34 billion USD). The implementation period is from 2025-2035.

The entire line is newly invested with a double gauge of 1,435 mm, a design speed of 350 km/h, a load capacity of 22.5 tons/axle; has 23 passenger stations, 5 freight stations; transports passengers, meets dual-use requirements for national defense and security, and can transport goods when necessary.

Regarding the North-South high-speed railway project, the Prime Minister requested to try to start construction in December 2026. He assigned the Ministry of Justice to give opinions on applying the simplified procedures in construction, and to issue a Decree on the overall design in early April; at the same time, ministries and branches promptly give opinions after the Ministry of Construction asks for opinions on the draft Decree.

  • Tweet
Tagged under: Khu công nghiệp Viglacera, North South high speed railway, viglacera, viglacera industrial parks

About cadmin

What you can read next

Groundbreaking Ceremony of CT3 – Thang Long Green City Project, a New Milestone in Social Housing Development in Hanoi
Viglacera Corporation – JSC brings love to Birla children’s village
Coastal road project behind schedule

Recent Posts

  • Draft created on October 9, 2024 at 2:32 am

    ...
  • Thuan Thanh Eco-Smart IP: A Rising Investment Destination In Northern Vietnam

    Viglacera is recognized as a leading industrial...
  • Viglacera’s Industrial Parks Accelerate Investment Promotion in October 2025

    In October 2025, Viglacera Real Estate Company ...
  • Viglacera Newsletter Q3 2025

    Viglacera Newsletter Q3 2025...
  • Viglacera’s Industrial Parks Accelerate Investment Promotion Activities in October 2025

    In October 2025, Viglacera Real Estate Company ...
VIGLACERA REAL ESTATE COMPANY
Office: 2nd Floor, Viglacera Tower, No. 1 Thang Long Boulevard, Dai Mo Ward, Hanoi
E-mail: vir@viglaceraland.vn | Fax: (+84-24) 3553 7666 | Tel: (+84-24) 3553 6688
Website: www.viglaceraip.com
HOTLINE
+84 888252288 | +84 987708387
+84 903405099 | +84 888692288

Copyright 2024 © Viglacera. Designed by INNOCOM.

TOP