Scale: 255ha
Project duration: 2024 - 2074
Industrial Park Advantages





Electricity is supplied from the national grid through 2 110/22KV transformer substations with a total capacity of 6 x 63 MVA & 1 Sông Công 2 110 KV transformer substation with a capacity of 50 MVA.

Water is supplied from the Sông Công Water Plant & Tích Lương Water Plant with a capacity of 7,200 m³/day and the industrial park's water supply station with a capacity of 9,000 m³/day.

The wastewater treatment station has a capacity of 6,000 m³/day.

The IP telecommunications system meets international standards and is equipped for high-speed communication and data transmission.

The road system within the industrial park is constructed based on a grid layout, ensuring convenient access to all land plots. Internal roads are designed with a minimum carriageway width of 10.5 meters, and sidewalks ranging from 8 to 10 meters.

Green spaces account for 12.5% of the total area.

The stormwater and wastewater drainage systems are constructed separately.

The fire-fighting water supply system is arranged along the internal roads. The distance between fire hydrants ranges from 120 to 150 meters..

The security guard ensures security inside the IP.

The firefighting water supply system is installed along the roadways of the IP.

The gas station is built right in the industrial park.

Vietinbank is located 3 km from the industrial park.

The post office is located 3 km from the industrial park.

The Thai Nguyen Customs Department is located 12 km from the industrial park.